Projects >
Commercial Office Renovation

Project details
Project Overview:
The project involved renovating an existing office space to modernize the interior, improve workflow efficiency, and enhance the overall work environment. The renovation aimed to create a contemporary, functional, and professional workspace.
Scope of Work:
Interior Design Planning: Collaborated with the client to redesign office layout including open-plan workstations, meeting rooms, and breakout areas.
Demolition and Structural Adjustments: Removed non-load-bearing walls, upgraded flooring, and reinforced structural elements where needed.
Electrical and HVAC Upgrades: Installed modern lighting, updated wiring, and optimized heating, ventilation, and air conditioning systems for energy efficiency.
Finishing and Furnishing: Applied modern finishes, installed partitions, furniture, and ensured ergonomic and aesthetic design standards were met.
Materials Used:
High-quality modular office furniture
Acoustic panels and glass partitions
LED lighting and energy-efficient electrical fittings
Commercial-grade flooring and wall finishes
Project Timeline:
Design and Planning: 3 weeks
Demolition and Structural Work: 2 weeks
Construction and Installation: 6 weeks
Final Fit-Out and Handover: 1 week
Challenges and Solutions:
Minimizing Disruption: Phased construction to allow partial office operation during renovation.
Upgrading Outdated Infrastructure: Rewired and upgraded HVAC without extensive downtime using modular installation methods.
Maintaining Budget: Sourced high-quality materials cost-effectively and optimized labor scheduling.
Outcome:
The renovated office now offers a modern, flexible, and efficient workspace, enhancing employee productivity and client impression. The project was completed on schedule, within budget, and complied with all commercial safety regulations.

